Re: ESD: It doesn't take much
Daryl Gerke   5/9/2014 1:19:51 AM
NO RATINGS
Hi Martin,

Good plan! It doesn't take much ESD, particularly when you are inside a system.  

In this case, my client kept insisting it couldn't be ESD, since nobody ever felt a shock.  But like you, we proved that ESD does, in fact, exist below the threshold of human feeling. Fortunately no damage - just upsets.

Glad to see you're still using the old (proven?) technology. I guess we've both reached the age where old is OK - just like fine wine :-)

All the best. And thanks for the comment!

Measurement.Blues
User Rank
CEO
ESD: It doesn't take much
Measurement.Blues   5/8/2014 11:29:29 AM
NO RATINGS
Daryl,

I once lost a PC motherboard to ESD while installing a new hard drive--never felt the zap. Ever since then, I use an ESD wrist strap when working on a computer and I try to keep one hand on the chassis at all times (not always possible).

I opend the 9-year-old desktop computer just the other day for its semiannual cleaning. It still runs.

 

Daryl Gerke
User Rank
Blogger
Re: Going to ground
Daryl Gerke   5/5/2014 3:01:27 PM
NO RATINGS
Yup, old grounds are like old guys - they can get cranky and cause problems.  Thanks, Russel!  

Russell P
User Rank
Rookie
Re: Going to ground
Russell P   5/5/2014 1:44:24 PM
NO RATINGS
I totally agree, Adequate Grounding is the First Test. Not by ohm meter, Use a Megometer. Flow some real power and measure the resistance under load.

As a retired USAF Aircraft Electronic Tech I can relate to the pressure of "It can't be that" But eventually, trust your instints & training, it usually pays off.

Worst case for me: The F-111 had "Grounding Rings" where many cable grounds and part chassis grounds were gathered to be taken to Airframe ground (No Earth ground available in airborne items). The rings would build up corrosion internally until various systems would start getting flaky, and writeups (Pilot Complaints) were not very consistent. RADAR was a common early fail item due to the power flowing in that system.

Eventually it always seemed to come down to a grounding ring somewhere that had not been touched in over a decade. Crank them apart and capture the crud falling out for evidence. Clean with a wire wheel and then re-assemble. Conductive grease not allowed ! Problems in multiple systems would evaporate.

Daryl Gerke
User Rank
Blogger
Re: Going to ground
Daryl Gerke   5/3/2014 5:37:56 PM
NO RATINGS
Exactly!  And thats why we don't do fixed price contracts :-)  Thanks for the comment!

perl_geek
User Rank
Freelancer
Re: Going to ground
perl_geek   5/3/2014 2:42:04 PM
NO RATINGS
When a client insists on some inefficient or unnecessary procedure, there's a simple mantra to repeat to oneself to make the situation tolerable; "The meter is running, the meter is running.....". (As long as it's not a fixed-price contract.)

Daryl Gerke
User Rank
Blogger
Re: Going to ground
Daryl Gerke   4/30/2014 5:43:29 PM
NO RATINGS
Good advice! Studies have shown that grounding is a major contributor to systems related EMI problems. Always a good place to start.  

The reason for checking RF first was at the customer's insistence. Based on the symptoms, I felt that was the least likely cause. But as a consultant, it is important to keep the client happy.

Although we checked the power interface next, the power disturbance analyzer had been in place for a week and showed no perturbations. One parameter monitored was the voltage between the power neutral and safety ground. So in a sense, we did start with the power grounding. 

A common power grounding problem is connecting the power neutral to the safety ground at more than one point. This often inadvertantly happens in sub-panels, which was part of my investigation. We chased the power wiring all the way back to the service panel, the point where the single return/safety ground bond should be made.  

The reason for checking ESD last was again at the customer's insistence that ESD was not an issue (I suspected otherwise.) The poor ground connection between the panel and cabinet was not readily apparent. At first glance, it looked OK. Only after removing a display for inspection did it become apparent that the display was not properly grounded to the cabinet.  Oh well...

Chasing problems in the field is often a process of elimination. Grounding is a good place to start as it is often relatively easy to check (or at least eliminate from further consideration.)  Thanks for your comment!   

perl_geek
User Rank
Freelancer
Going to ground
perl_geek   4/30/2014 2:47:33 PM
NO RATINGS
Checking the grounding first seems to be a good heuristic whenever intermittent electrical or electronic problems occur. It can't do any harm, and may cure the problem straight away.

More Blogs from Engineering Investigations
An analog engineer and a digital engineer join forces, use their respective skills, and pull a few bunnies out of a hat to troubleshoot a system with which they are completely unfamiliar.
You rarely get anything extra for free. Engineers who work on vision systems know this. But sometimes other people believe that just putting a camera on it constitutes an effective inspection setup.
It's really mind-boggling to think of what my hourly rate would be if I were paid for the actual time that I spent troubleshooting a problem to get to a fix. The challenge is to avoid going down a rathole.
Often water flow is used to explain basic electronics in the form of analogies. After learning the hard way, an engineer attempts to explain basic water flow in terms of electronics.
We in the EMC/EMI world often use the saying "Don't put the well next to the outhouse" to describe large EMI sources located next to very sensitive victims.
August Cartoon Caption Winner!
August Cartoon Caption Winner!
"All the King's horses and all the KIng's men gave up on Humpty, so they handed the problem off to Engineering."
5 comments
Top Comments of the Week
Like Us on Facebook

Datasheets.com Parts Search

185 million searchable parts
(please enter a part number or hit search to begin)
EE Times on Twitter
EE Times Twitter Feed
Flash Poll
Radio
LATEST ARCHIVED BROADCAST
David Patterson, known for his pioneering research that led to RAID, clusters and more, is part of a team at UC Berkeley that recently made its RISC-V processor architecture an open source hardware offering. We talk with Patterson and one of his colleagues behind the effort about the opportunities they see, what new kinds of designs they hope to enable and what it means for today’s commercial processor giants such as Intel, ARM and Imagination Technologies.