Breaking News
News & Analysis

Analyst: UMC 28-nm roll out beating expectations

2/9/2012 06:33 PM EST
6 comments
NO RATINGS
More Related Links
View Comments: Newest First | Oldest First | Threaded View
krisi
User Rank
CEO
re: Analyst: UMC 28-nm roll out beating expectations
krisi   2/13/2012 6:35:31 PM
NO RATINGS
Isn't high-k dieletcric is only needed for gate leakage? Most of the leakage is between source and drain so the total leakage is not that much different pressumably...Kris

PV-Geek
User Rank
Rookie
re: Analyst: UMC 28-nm roll out beating expectations
PV-Geek   2/12/2012 2:17:38 AM
NO RATINGS
Not doing the HKMG certainly makes things easier. If there are a good number of customers that can live with the leakage then this could be good money for UMC. It all depends on how much volume they can get.

yalanand
User Rank
Rookie
re: Analyst: UMC 28-nm roll out beating expectations
yalanand   2/11/2012 11:41:10 AM
NO RATINGS
Interesting to note that UMC had "smoother-than-expected R&D and pilot run," is it because it took precaution while building its 28nm process or was it plain lucky ? I am sure it would have learnt some lessons from TSMC/GF's mistakes when implementing 28nm process.

chipmonk0
User Rank
CEO
re: Analyst: UMC 28-nm roll out beating expectations
chipmonk0   2/10/2012 7:11:54 PM
NO RATINGS
Does TI not care about the leakage / power dissipation for their OMAP built by UMC with ye olde polysilicon/silicon oxynitride gate stack rather than HKMG like TSMC / GloFo would have at 28 nm LP ? Perhaps this is just a stop gap / get a foot in the door for a OEM ( A?) who can't wait till UMC gets its HKMG ready at 28 nm.

Fab guy
User Rank
Rookie
re: Analyst: UMC 28-nm roll out beating expectations
Fab guy   2/10/2012 3:56:35 AM
NO RATINGS
Well, their 28nm is a conventional gate stack process (poly Si gate with SiON gate oxide) and a far more sophisticated high-k dielectric and metal gate process which is the main stream for TSMC and Intel, IBM.

mcgrathdylan
User Rank
Blogger
re: Analyst: UMC 28-nm roll out beating expectations
mcgrathdylan   2/10/2012 1:29:17 AM
NO RATINGS
It's quite interesting that UMC seems to be ahead of schedule at 28-nm when it apparently caused TSMC and GF a lot of headaches.

Flash Poll
Radio
LATEST ARCHIVED BROADCAST
EE Times editor Junko Yoshida grills two executives --Rick Walker, senior product marketing manager for IoT and home automation for CSR, and Jim Reich, CTO and co-founder at Palatehome.
Like Us on Facebook

Datasheets.com Parts Search

185 million searchable parts
(please enter a part number or hit search to begin)
EE Times on Twitter
EE Times Twitter Feed