Breaking News
News & Analysis

Analyst: UMC 28-nm roll out beating expectations

2/9/2012 06:33 PM EST
6 comments
NO RATINGS
More Related Links
View Comments: Threaded | Newest First | Oldest First
mcgrathdylan
User Rank
Blogger
re: Analyst: UMC 28-nm roll out beating expectations
mcgrathdylan   2/10/2012 1:29:17 AM
NO RATINGS
It's quite interesting that UMC seems to be ahead of schedule at 28-nm when it apparently caused TSMC and GF a lot of headaches.

Fab guy
User Rank
Rookie
re: Analyst: UMC 28-nm roll out beating expectations
Fab guy   2/10/2012 3:56:35 AM
NO RATINGS
Well, their 28nm is a conventional gate stack process (poly Si gate with SiON gate oxide) and a far more sophisticated high-k dielectric and metal gate process which is the main stream for TSMC and Intel, IBM.

chipmonk0
User Rank
CEO
re: Analyst: UMC 28-nm roll out beating expectations
chipmonk0   2/10/2012 7:11:54 PM
NO RATINGS
Does TI not care about the leakage / power dissipation for their OMAP built by UMC with ye olde polysilicon/silicon oxynitride gate stack rather than HKMG like TSMC / GloFo would have at 28 nm LP ? Perhaps this is just a stop gap / get a foot in the door for a OEM ( A?) who can't wait till UMC gets its HKMG ready at 28 nm.

yalanand
User Rank
Rookie
re: Analyst: UMC 28-nm roll out beating expectations
yalanand   2/11/2012 11:41:10 AM
NO RATINGS
Interesting to note that UMC had "smoother-than-expected R&D and pilot run," is it because it took precaution while building its 28nm process or was it plain lucky ? I am sure it would have learnt some lessons from TSMC/GF's mistakes when implementing 28nm process.

PV-Geek
User Rank
Rookie
re: Analyst: UMC 28-nm roll out beating expectations
PV-Geek   2/12/2012 2:17:38 AM
NO RATINGS
Not doing the HKMG certainly makes things easier. If there are a good number of customers that can live with the leakage then this could be good money for UMC. It all depends on how much volume they can get.

krisi
User Rank
CEO
re: Analyst: UMC 28-nm roll out beating expectations
krisi   2/13/2012 6:35:31 PM
NO RATINGS
Isn't high-k dieletcric is only needed for gate leakage? Most of the leakage is between source and drain so the total leakage is not that much different pressumably...Kris

August Cartoon Caption Winner!
August Cartoon Caption Winner!
"All the King's horses and all the KIng's men gave up on Humpty, so they handed the problem off to Engineering."
5 comments
Top Comments of the Week
Like Us on Facebook

Datasheets.com Parts Search

185 million searchable parts
(please enter a part number or hit search to begin)
EE Times on Twitter
EE Times Twitter Feed
Flash Poll
Radio
NEXT UPCOMING BROADCAST
How to Cope with a Burpy Comet
October 17, 2pm EDT Friday
EE Times Editorial Director Karen Field interviews Andrea Accomazzo, Flight Director for the Rosetta Spacecraft.