Breaking News
News & Analysis

ASML funding plan targets proposed 2018 EUV machine

7/10/2012 04:07 PM EDT
16 comments
NO RATINGS
More Related Links
View Comments: Oldest First | Newest First | Threaded View
<<   <   Page 2 / 2
RogerMel
User Rank
Rookie
re: ASML funding plan targets proposed 2018 EUV machine
RogerMel   7/11/2012 5:38:30 AM
NO RATINGS
sprite0022 what are you smoking?

Mark1980
User Rank
Rookie
re: ASML funding plan targets proposed 2018 EUV machine
Mark1980   7/11/2012 7:55:52 PM
NO RATINGS
I don`t see samsung joining, simply bcoz IBM, GLOFO and the rest will not be happy and its not certain ASML will produce the results, if ASML fail, thIeR shares will tank and the money invested will be lost.. I think TSMC will join (best case scenario)

gnipho
User Rank
Rookie
re: ASML funding plan targets proposed 2018 EUV machine
gnipho   7/12/2012 12:40:07 PM
NO RATINGS
Moore's law is not so much about getting more transistors on a wafer by making them smaller, it's basically about reducing the cost per transistor. Making transistors smaller using EUV is at the moment too expensive so reducing the cost per transistor by moving to 450nm is the logic way to go and meet Moore's law.

DrQuine
User Rank
CEO
re: ASML funding plan targets proposed 2018 EUV machine
DrQuine   7/15/2012 9:49:39 PM
NO RATINGS
Hmm. If a high return on investment were assured, the company would be funding it themselves. Seeking to spread the risk among their customers suggests a level of elevated business risk.

Peter Clarke
User Rank
Blogger
re: ASML funding plan targets proposed 2018 EUV machine
Peter Clarke   7/16/2012 9:14:43 AM
NO RATINGS
The main issue is that at the 300-mm transition the chipmakers pressured the equipment makers to take on all the risk saying that the first companies to offer 300-mm versions in various equipment categories would "clean up" and get lets of orders. The the 300-mm transition stalled (I forget why, but i think there was some economic crash or others) and was long and drawn out. The second movers were able to catch up and a lot of equipment makers got burned. This time around we are down to close to monopoly suppliers...ASML, Applied Materials ...and they are starting to tell customers.....you want this work doing...you got to foot the bill...up front....and sign some purchase orders.

resistion
User Rank
CEO
re: ASML funding plan targets proposed 2018 EUV machine
resistion   11/2/2012 2:51:42 PM
NO RATINGS
So all this money went to buy Cymer instead? Actually not enough, even?

<<   <   Page 2 / 2
August Cartoon Caption Winner!
August Cartoon Caption Winner!
"All the King's horses and all the KIng's men gave up on Humpty, so they handed the problem off to Engineering."
5 comments
Top Comments of the Week
Like Us on Facebook

Datasheets.com Parts Search

185 million searchable parts
(please enter a part number or hit search to begin)
EE Times on Twitter
EE Times Twitter Feed
Flash Poll
Radio
NEXT UPCOMING BROADCAST
How to Cope with a Burpy Comet
October 17, 2pm EDT Friday
EE Times Editorial Director Karen Field interviews Andrea Accomazzo, Flight Director for the Rosetta Spacecraft.