Design Con 2015
Breaking News
Design How-To

Time to streamline thermal management design and production

NO RATINGS
Page 1 / 3 Next >
More Related Links
View Comments: Newest First | Oldest First | Threaded View
docdivakar
User Rank
CEO
re: Time to streamline thermal management design and production
docdivakar   8/13/2012 8:36:09 PM
NO RATINGS
I don't believe there is chronic a “disconnect” between thermal management specialists and real world manufacturing the author is pointing to. Most companies I know of (including several where I worked) took into considerations the variations in material properties, assembly process (reflow & on-board thermocouple locations), were considered and bracketed for upper and lower bounds. There is some relevance to the language issue when communicating design and assembly specs to overseas vendors. MP Divakar

Most Recent Comments
perl_geek
 
AZskibum
 
AZskibum
 
AZskibum
 
AZskibum
 
mhrackin
 
DrQuine
 
R_Colin_Johnson
 
R_Colin_Johnson
Radio
LATEST ARCHIVED BROADCAST
EE Times Senior Technical Editor Martin Rowe will interview EMC engineer Kenneth Wyatt.
Top Comments of the Week
Like Us on Facebook

Datasheets.com Parts Search

185 million searchable parts
(please enter a part number or hit search to begin)
EE Times on Twitter
EE Times Twitter Feed
Flash Poll