Breaking News
Design How-To

Multi-level-cell PCMs last for 10 million cycles, Part 1

6/25/2013 05:31 PM EDT
2 comments
NO RATINGS
Page 1 / 2 Next >
More Related Links
View Comments: Newest First | Oldest First | Threaded View
Ron Neale
User Rank
Blogger
re: Multi-level-cell PCMs last for 10 million cycles, Part 1
Ron Neale   6/26/2013 7:43:51 AM
NO RATINGS
Resistion-While I am always ready to speculate, as you will see in part II, rather than optimism IBM's results indicate that any different rates of drift remain within the expanding and predictable distribution. Even if it does happen the second level error detection (correction) in the codeword would take care of it.

resistion
User Rank
CEO
re: Multi-level-cell PCMs last for 10 million cycles, Part 1
resistion   6/26/2013 1:23:30 AM
NO RATINGS
It is optimistic to assume fixed uniform drift rates within the distributions.

August Cartoon Caption Winner!
August Cartoon Caption Winner!
"All the King's horses and all the KIng's men gave up on Humpty, so they handed the problem off to Engineering."
5 comments
Top Comments of the Week
Like Us on Facebook

Datasheets.com Parts Search

185 million searchable parts
(please enter a part number or hit search to begin)
EE Times on Twitter
EE Times Twitter Feed
Flash Poll
Radio
NEXT UPCOMING BROADCAST
How to Cope with a Burpy Comet
October 17, 2pm EDT Friday
EE Times Editorial Director Karen Field interviews Andrea Accomazzo, Flight Director for the Rosetta Spacecraft.