Breaking News
GlobalFoundries Wins Approval for Next NY Fab
8/30/2013

Fab 8.1 during construction in Luther Forest Technology Campus.
Fab 8.1 during construction in Luther Forest Technology Campus.

Return to Article

View Comments: Oldest First | Newest First | Threaded View
Page 1 / 2   >   >>
krisi
User Rank
CEO
15B
krisi   8/30/2013 1:46:10 PM
NO RATINGS
Apple will have to foot the bill for this fab

elctrnx_lyf
User Rank
Manager
Re: 15B
elctrnx_lyf   8/31/2013 9:40:27 AM
NO RATINGS
Apple would definitely consider GF if they are planning to bring back manufacturing to USA.

wilber_xbox
User Rank
Manager
Re: 15B
wilber_xbox   8/31/2013 10:09:06 AM
NO RATINGS
NY will be foundry hub then. Maybe other companies than Apple will be willing to bring manufacturing back but from where 15B USD will come. How much is government's contribution. Also, only 2000 more jobs does not sound like much given the scale of investment.

selinz
User Rank
CEO
Re: 15B
selinz   8/31/2013 11:37:09 AM
NO RATINGS
Do you really think that Apple would consider Global just because they've got manufacturing in the US? What recent history leads you to this conclusion?

krisi
User Rank
CEO
Re: 15B
krisi   8/31/2013 12:13:09 PM
NO RATINGS
that is the problem with high tech in North America, lots of money, few jobs

lidation
User Rank
Freelancer
Re: 15B
lidation   9/1/2013 1:42:37 AM
I highly doubt GF will be anywhere close to TSMC or Samsung in terms of competitiveness, given their past track record.

Sheetal.Pandey
User Rank
Manager
Re: 15B
Sheetal.Pandey   9/1/2013 2:31:51 PM
NO RATINGS
That is good news for american workforce its important that manufacturing happens within america there is lot of unrest when these kind of business opportunities goes outofthe country but wonder how they would be managing cost.

Peter Clarke
User Rank
Blogger
Re: 15B
Peter Clarke   9/2/2013 6:06:17 AM
NO RATINGS
Well Fab 8.1 is expected to employ 2,100 going on 3,000 staff and Fab 8.2 is taking the total for the whole camput to 6,700.

So that would be between about 3,700 and 4,600 extra jobs.

And remember with automated wafer fabs it is not really about the headcount. It is about the wafer count.

 

 

DMcCunney
User Rank
CEO
Re: 15B
DMcCunney   9/3/2013 3:33:15 PM
NO RATINGS
Also, only 2000 more jobs does not sound like much given the scale of investment.

It's not, but that's the nature of high-tech.  It's a classic capital-intensive business.  Semi-conductor fabs are astronomically expensive to build, and getting more so, because the euipment installed in the fabs to make the semi-conductors is fantastically expensive, and getting more so as process geometries shrink.

It's not like the old fshioned factory with lots of guys in the assembly line.  The machines do the work, and the people are there to program and maintain the machines and the plant the machines are installed in.  It doesn't take a huge worforce to do it.It will benefit the local economy as the source of some jobs when up and running, and have secondary benefits to the region in terms of supplying what the plant and its workers need, and to the regions and the state in terms of tax revenues.

There are somewhat higher costs because of the location, land cost, construction cost. and tax structure.  While the plant will offer likely higher wages than an offshore fab, wage costs are unlikely to be a significant addition to the overall cost of operating the fab.

The fab has the advantage of being closer to the customer for faster design cycles and quicker time to market, which is likely to offset the higher costs.

jwalter
User Rank
Rookie
Re: 15B
jwalter   9/4/2013 1:15:07 AM
NO RATINGS
"The fab has the advantage of being closer to the customer for faster design cycles and quicker time to market, which is likely to offset the higher costs."

Not if the main customer is to be Apple.  Most of their current chips are made in Texas (closer to Apple HQ in Cali) and if you really think about cycle time of product then Taiwan (TSMC) is actually a better choice considering Foxconn is in China.

Unfortunately what is understated in this article are the real jobs that will be created.  They mention only the GF jobs, but what about the constructions workers, road builders, tool installers, etc, etc, etc.  That being said the track record of GF is not that great so far and they are far from fully utlizing Fab 8.1 so to be planning Fab 8.2 is a bit premature in my opinion.

Page 1 / 2   >   >>
Flash Poll
Radio
LATEST ARCHIVED BROADCAST
EE Times editor Junko Yoshida grills two executives --Rick Walker, senior product marketing manager for IoT and home automation for CSR, and Jim Reich, CTO and co-founder at Palatehome.
Like Us on Facebook

Datasheets.com Parts Search

185 million searchable parts
(please enter a part number or hit search to begin)
EE Times on Twitter
EE Times Twitter Feed
Top Comments of the Week