Design Con 2015
Breaking News
News & Analysis

So Much Work, So Little Time for Engineers

8/19/2014 09:00 AM EDT
38 comments
NO RATINGS
1 saves
Page 1 / 2 Next >
More Related Links
View Comments: Newest First | Oldest First | Threaded View
Page 1 / 4   >   >>
Max The Magnificent
User Rank
Blogger
Re: Taking Up Engineering Time
Max The Magnificent   9/6/2014 11:26:41 AM
NO RATINGS
@Karen @Davd: @Karen...Love those rosy cheeks!!"

Thank you David, I blush easily!!

 

That brought a flush to my cheeks...

(and my face went red as well! LOL)

zeeglen
User Rank
Blogger
Re: Engineering productivity
zeeglen   9/6/2014 11:10:41 AM
NO RATINGS
@Avanis Engineering productivity cannot always be measured in number of hours


Especially when the task demands some creative problem solving.  Sometimes the mind cannot be pushed to instant solutions in an 8 hour time frame. The answers often come at home after an evening or weekend of thinking about the problem.

Avinash Jois
User Rank
Rookie
Engineering productivity
Avinash Jois   9/6/2014 9:48:04 AM
NO RATINGS
Engineering productivity cannot always be measured in number of hours....8Hrs of work life per day only brings more discipline into your life. I believe productivity is more a function of non linear aspects like passion and motivation for work rather than hours especially for start ups.

_hm
User Rank
CEO
Re: A fact of life?
_hm   9/4/2014 10:15:07 PM
NO RATINGS
@MP Divakar: Yes, I very much have same idea. If you work real 8 hours a day, you can do have wonderful achievements. Do not play truant make work looks like 12 hours a day. 

kfield
User Rank
Blogger
Re: Taking Up Engineering Time
kfield   9/2/2014 12:17:01 PM
NO RATINGS
@David Ashton "@Karen...Love those rosy cheeks!!"

Thank you David, I blush easily!!

kfield
User Rank
Blogger
Re: Theoretical limit
kfield   9/2/2014 12:16:25 PM
NO RATINGS
@docdivakar "Many meetings scheduled were working meetings, often "standing only" type meetings where people realized the wisdom of getting to the point quickly!"

Absolutely love the idea of standing-only meetings, talk about a fantastic way to keep it short!

docdivakar
User Rank
CEO
A fact of life?
docdivakar   9/2/2014 12:12:31 PM
NO RATINGS
Many of us who are in startups routinely put in 12+ hour work days and it has become the norm. Silicon Valley in general has many engineers who routinely work long hours into the evening.

In many big name companies that have fitness rooms, yoga sessions, cafeterias, etc., long hours at office does not necessarily mean long 'productive' hours! I would argue that one can get the same throughput by focussed and targeted work hours in eight-hour day and do everything else like yoga, fitness, away from office or at home.

MP Divakar

docdivakar
User Rank
CEO
Re: Theoretical limit
docdivakar   9/2/2014 11:55:40 AM
NO RATINGS
@RDC IP I have had consecutive F2F meetings scheduled in buildings separated by 5 miles, one of which I have had the pleasure(?) of waiting at a railroad crossing several times during my tenure at that company! I don't know how people who schedule meetings don't get the fact that if one meeting ends at 3:00PM, another one 5 miles away can not start at 3:00PM if a required attendee has to attend!

Regarding your comment on dev plans, six sigma, etc., I have led many successful implementations of them. Many meetings scheduled were working meetings, often "standing only" type meetings where people realized the wisdom of getting to the point quickly!

MP Divakar

jimwilliams57
User Rank
Manager
Re: This is news?
jimwilliams57   9/2/2014 9:05:56 AM
NO RATINGS
@Reverse Engineer: But silly cost cutting and management interference (especially with schedules and resources) is worse than ever.

Back in 2001 I worked for a startup not far from Silicon Valley. Most of engineering was working 50-60 hour weeks when management asked us for a detailed schedule of all remaining work. After we delivered the schedule, they compressed what we had supplied into 80 hour weeks and gave it back to us with the instruction that we were to work 12 hour days, 7 days a week until all work was completed. The result was total rebellion. From that day forward, roughly 95% of the engineers started working strict 40 hour work weeks and the company soon went out of business.

BobsView
User Rank
CEO
Re: Do more with less
BobsView   9/2/2014 8:59:18 AM
NO RATINGS
Do more with less?

I wonder if the investors will take their own advice:

"Be happy with less!"

 

 

Page 1 / 4   >   >>
Most Recent Comments
didymus7
 
cd2012
 
GerryWood
 
prabhakar_deosthali
 
prabhakar_deosthali
 
prabhakar_deosthali
 
stevestark002
 
David Ashton
 
R_Colin_Johnson
Radio
LATEST ARCHIVED BROADCAST
EE Times Senior Technical Editor Martin Rowe will interview EMC engineer Kenneth Wyatt.
Top Comments of the Week
Like Us on Facebook

Datasheets.com Parts Search

185 million searchable parts
(please enter a part number or hit search to begin)
EE Times on Twitter
EE Times Twitter Feed
Flash Poll