@jadesbox,

You have hit on what I believe is one of the most ...

More...



jadesbox

1/11/2011 10:25 AM EST

"a lot resources are wasted on projects that should never have been started in ...

More...

Throughput, not productivity, is what matters

Ron Collett

12/13/2010 12:45 PM EST

Discussions about R&D return-on-investment (RoI) among semiconductor industry executives often turn to engineering productivity. They're often surprised when I assert that productivity isn't that important—at least as far as R&D performance metrics are concerned. A far more important metric is engineering throughput.

Throughput measures rate of output and therefore quantifies how fast you develop products. Productivity measures how efficiently you develop them. Throughput is about cycle time. Productivity is about cost. The more productive your teams, the fewer engineers needed to develop products—hence the lower the development cost. But what's more important, cost or time-to-market?

Throughput's dimensions are "output per week." For example, output quantified in "Design Units" yields Design Units per Week. Unlike productivity, throughput ignores the amount of manpower the team expends to create that output. It simply quantifies the output and divides it by the project's duration (concept to release-to-production), measuring output per unit of time.

The distinction between throughput and productivity is important because time-to-market usually trumps all else. I'm not suggesting efficient development isn't important, but throughput, and therefore time-to-market, is what usually generates the most revenue and profits.

R&D organizations can increase throughput on their projects in four ways: (1) by raising the average productivity among team members, which means executing tasks more efficiently and therefore expending less effort; (2) by increasing the number of hours in the standard work-week—not particularly popular among engineers, but one that often finds favor with management; (3) by eliminating low value-add activities that consume project resources, thereby increasing engineering resource utilization; and (4) by increasing the project's staffing level.

The first two—increasing productivity and encouraging longer hours—rarely yield competitive advantage. That's because nearly all R&D organizations pursue them (to survive), enabling them only to keep pace with the industry norm.  

The latter two – increasing utilization and staffing—are the opportunities for differentiation and competitive advantage. Most companies are reluctant to pursue these insidious root causes of low throughput. That's because eliminating non value-added tasks can be contentious and politically unpopular—nobody likes to hear their job has little value add.  Likewise, increasing staffing level means taking on fewer projects, which can also be quite contentious and riddled with politics.

Ronald Collett is president and CEO of Numetrics Management Systems, Inc. www.numetrics.com.




Me2

12/13/2010 5:16 PM EST

One of the buzz words I've heard in this realum is "Factory Physics" which is the scheduling of factory equipment such that WIP does not site waiting for a piece of equipment to be available. In other words, if a tool is working efficently, but the scheduling department is not scheduling correctly, throughput is affected. Nice article.

Sign in to Reply



RCollett

12/13/2010 9:26 PM EST

@Me2,

Seems that Factory Physics is now an official discipline -- quoting from the Kellogg School of Management website: "Factory Physics is a set of 'laws' representing the core science of lean manufacturing, which describe the underlying operations behavior of manufacturing systems, including the fundamental relationships between performance measures such as throughput, work-in-progress, manufacturing cycle time, and process variability. Taken together, these tools provide a firm scientific foundation for the practice of lean manufacturing.

Thanks for the comment.

Ron


Sign in to Reply



daleste

12/13/2010 7:01 PM EST

I enjoyed your article. It brought to mind a couple of quotes from my past. A great leader once told me, "A good engineer will keep working on a new product until it is perfect. A great engineer knows when it is good enough to release to production." When asked if adding more designers to the project would speed up the schedule, the design leader told me, "If it takes one woman 9 months to make a baby, how long does it take 5 women to do it?"

Sign in to Reply



RCollett

12/13/2010 9:43 PM EST

@daleste,

I think you are alluding to the Mythical Man-Month, a book written by Frederick Brooks in 1975. Mr. Brooks' book is best known for its formulation of Brooks’s Law: “Adding manpower to a late software project makes it later.”

However, allocating the correct number of engineers to a project from its outset is what I was referring to. In other words, staffing it correctly by ensuring that the staffing level is commensurate with the design's complexity, which includes both the deterministic and stochastic aspects of design complexity.

Thanks for the comment.

Rgds,

Ron

Sign in to Reply



Frank Eory

12/22/2010 3:38 PM EST

Ron, we have probably all experienced examples of Brooks' Law -- which applies just as well to hardware projects as to software projects.

The difficulty is how to accurately estimate the correct number of engineers and specific engineering skillsets to allocate to the project and when to add them.

Increasingly, project managers today either do not come up through engineering, or else their hands-on engineering development days were so long ago they are no longer relevant to today's NPI processes and methodologies.

It seems to be an extraordinarily difficult task to make the correct assessment. The consequences of underestimating the resourcing needs is a missed schedule, which might mean a complete waste of an investment, and the consequence of overestimating the resources is excessive R&D cost.

These days, almost any manager will take the cost-conservative approach and assume that engineering will find a way to meet the schedule and make up for any project management/staffing shortcomings. Translation: They will also fall back to your Option 2 -- expect engineering to work longer, harder and smarter.

Sign in to Reply



RCollett

12/22/2010 6:06 PM EST

Frank,

Generating consistently reliable estimates of resources and schedule requires an empirically calibrated model whose inputs include (1) a description of the technical attributes of the design, (2) the likely performance range of the development team (best case to worst case), and any constraints on the project (i.e. schedule, staffing). The key to creating a good model is to have a wealth of project data. In the IC space, our models leverage an industry database of 1,600 production IC projects comprising 30,000 circuit blocks. Its predictive power is strong. The coefficient of determination is 0.93 (i.e. R-squared value) when we plot Estimated Project Effort vs. Actual Project Effort. Top semiconductor companies across the industry can vouch for its accuracy and efficacy.

Thanks for the comment.

Rgds,

Ron

Sign in to Reply



no.name_#4

12/14/2010 5:22 AM EST

I think this article ties into EE Times 11/22/2010 "Semiconductor success is no longer about the chips, it’s about end customers", with its emphasis on successful companies being product-centric.

In my 20+ yrs experience in various Semiconductor Fabs, the successful companies where successful in their time because they had a unique product/chip that was in demand. That demand in part was driven by economic realities but more so by an end-user purchasing decision for a product that was enabled by their unique product/chip.

Daring to have product R/D is daring to have a unique and market untested products (taking investment risks and investing back into the company). This takes vision and Steve Jobs best exemplifies this quality.

Now days, many companies prefer to follow behind a product acceptance cycle rather then lead it, with the idea they can predictably and with low risk do a same/similar product cheaper & faster. These companies don't grow or create new markets they just go for shares of existing markets. As markets shifts, so do the fortunes of these companies shift.

There aren't many Silicon Semi-Companies with significant new product R/D anymore (Intel, Apple, IBM, Toshiba) are the only ones that come to my limited mind. The others just seem to follow or just refine existing product lines (TI, Qualcom, National, Lucent...).

Sign in to Reply



daleste

12/14/2010 12:37 PM EST

I agree that most companies spend most of their R&D making incremental improvements on existing products. This is the safest way to getting good return on investment. The "home run" product takes much more investment and is usually an unknown in the market place. It may be accepted and be wildly successful or it may be a dud and a waste of R&D resources. Very few companies want to take that kind of risk.

Sign in to Reply



RCollett

12/14/2010 3:27 PM EST

@no.name_#4,

Not sure that the TI, Qualcomm, National and Lucent would agree with you that they merely follow or just refine existing product lines -- I'll let them weigh in on that if they care too. Notwithstanding that debate, your overall point is well taken -- that pioneering new technologies, products and applications takes vision. It also takes money. The two go hand in hand.

On the money front, I believe that one of the core problems is that a lot resources are wasted on projects that should never have been started in the first place. This is money down the drain. Resources get spread too thin when companies take on too many projects. One of the primary reasons they take on too many is because they think they can finish them with fewer engineers than is possible. In sum, there is a misalignment between the design's complexity and staffing level. I observe this first-hand every day of the week.

Thanks for your comment.

Rgds,

Ron

Sign in to Reply



RCollett

12/18/2010 1:43 PM EST

@daleste,
With SoC development costs routinely ranging from $50M to $100M, it's no surprise that few companies want to take on additional risk. Moreover, the consequence of such skyrocketing costs is that SoC product revenue must be much higher than in the past -- to justify the investment. Sales must reach $250M to $500M, because the R&D RoI must be at least 5X. Achieving such revenue targets means the total market size must be at least $750M to $1.5B, because one must assume a maximum of only thirty to forty percent market share. There aren't that many markets of that size. Bottom-line: participating in the SoC business means there is little if any margin for error. It requires picking the right market opportunities and hitting development schedule targets.
Rgds, Ron

Sign in to Reply



jadesbox

1/11/2011 10:25 AM EST

"a lot resources are wasted on projects that should never have been started in the first place"

Indeed, but shall a project manager refuse a project he thinks would be a waste of the company's money, or shall he accept such a challenge?

The choice is easy the first attitude would be detrimental to his career while the second would be beneficial unless it brings the company to bankrupcy.

Sign in to Reply



RCollett

1/13/2011 8:03 PM EST

@jadesbox,

You have hit on what I believe is one of the most insidious problems in the semiconductor industry -- the conflict of interest facing engineers and project managers. They accept projects that they know will not finish anywhere close to the target schedule. That's because the staffing-level allocated to the project is inadequate, given the design's complexity. What goes a long way toward solving the problem are fact-based estimates of resource requirements. When the organization has reliable estimates, far better decisions are made.

Thanks for the comment.

Ron

Sign in to Reply



prabhakar_deosthali

12/21/2010 4:39 AM EST

Just when the new Millennium started, I was party to an innovative R & D project where my company after discovering that the product being developed had potentially a very revolutionary effect on the market, spent all its efforts in getting worldwide patents for the technology being developed but failed to provide enough R & D resources to bring the product to a level where it could be shown to have commercial viability. The company got the patents but could not get advantage of them. Millions of dollars were just wasted in the whole process. All the industrial giants who had shown interest in our technology could not get the sample prototypes in time and hence turned their back to us. Eventually the company went bankrupt with the patent power and the technology remaining only on the paper!

Sign in to Reply



RCollett

12/22/2010 3:10 PM EST

Prabhaker,

Once the technology was patented, was an effort made to attract investors (i.e. VC's, Angel investors, etc.). If not, why not? If so, then why did they choose not to invest.

Rgds,

Ron

Sign in to Reply



RWatkins

12/22/2010 10:06 AM EST

As a member of a small design house that specializes in doing what others couldn't... (just so my bias is clear) In 30+ years of engineering experience, sometimes as observer and sometimes as participant, I have come to believe that the incremental improvements are merely necessary for survival and maintenance of the status quo, while "pioneering new technologies" are what keeps jobs and income where the best engineers are. If all I do as an engineer is fine-tune a product BOM for cost, you might as well find a lower cost engineer in China to do the same job (as long as you don't mind the learning curve as he substitutes parts that are too "cheap"). On the other hand, if you need a solution that has evaded in some cases generations of engineers that might be enabled by new technology and/or a lifetime of experience of a carefully observing practicing engineer, sending the product to a "high productivity" house will fail every time.

Sign in to Reply



RCollett

12/22/2010 3:36 PM EST

@RWatkins,

I agree. What I think we're talking about determining the primary opportunity for engineers and scientists based in the U.S. -- to create products or offer services that are heavily differentiated from those that can be easily replicated in low-cost, off-shore regions of the world. How can it be otherwise? These are the "new technologies" to which you're referring. They are the ones comprising higher value-add, and therefore they command a price premimum, which justfies the higher labor cost. In short, the U.S. engineering community must be able to differentiate itself from the engineering community in low-cost regions.

Also, small clarification to your point about a "high productivity house" -- I'm sure you'll agree that offshoring does not necessarily equate to high productivity. In fact, it's probably the opposite. Instead, teh promise of offshoring is higher development-throughput, which is the the amount of output created in a given time period. The availability of low cost (off-shore) labor means more bodies can be thrown at the project, which usually (but not always) results in higher throughput.

Thanks for the comment.

Ron

Sign in to Reply



Please sign in to post comment

Navigate to related information

Datasheets.com Parts Search

185 million searchable parts
(please enter a part number or hit search to begin)