Design Con 2015
Breaking News
Comments
Newest First | Oldest First | Threaded View
any1
User Rank
CEO
re: Updated: 450-mm fab schedule slips
any1   1/26/2011 1:55:17 PM
NO RATINGS
The transition to 450 mm has been a tough sell for sure, but I can foresee a time where once a couple of early adopters such as Intel and Samsung make the move to 450 mm other companies will be forced to follow or they will no longer be competitive - especially the commodity memory producers. At that point we may see more consolidation and joint ventures as smaller players struggle to survive.

krisi
User Rank
CEO
re: Updated: 450-mm fab schedule slips
krisi   1/25/2011 11:40:28 PM
NO RATINGS
I agree with Dave and @docdivakar and think this transition will continue to get pushed out...who can really afford it? Its a huge investment requiring new tools and new fabs. Intel and Samsung for sure but I doubt there will be many more takers...there is much more excitement in semi industry in growing vertically (3-D) than horizontally! I bet in the future there will be more silicon cubes than large silicon pizzas! Kris

Dave.Dykstra
User Rank
Rookie
re: Updated: 450-mm fab schedule slips
Dave.Dykstra   1/25/2011 9:57:12 PM
NO RATINGS
This is not too surprising given the state of the world's economies during the past couple of years. If you've not yet been able to get adequate returns on the current state of the art, you really aren't very willing to move on to the next, especially if you're still able to make money at the current level. I suspect we'll see a few large players making the move because they have seen the returns and can afford the investment and some slightly smaller players holding back and hoping to leap-frog to the next level when it becomes available.

docdivakar
User Rank
Manager
re: Updated: 450-mm fab schedule slips
docdivakar   1/25/2011 8:18:43 PM
NO RATINGS
The analyst from Piper Jaffray makes a valid point: until the equipment makers (I would include backend and test equipment as well) see value-adding opportunity, the 450mm launch will keep getting pushed out. Chances are, by 2015 and beyond, there will be fewer fabs that can afford the $Billions needed to upgrade. This is definitely a quandary for the 300mm fabs; on one hand, we see fewer fabless companies with products off the drawing board (we hear any where from $5M to $50M for a new ASIC development), more consolidation that seems to be coming in fabless companies, while on the other, emerging 3D chips may still use 200mm wafers, or worse, put more pricing pressure on the 300mm fabs. MP Divakar



Flash Poll
Top Comments of the Week
Like Us on Facebook
EE Times on Twitter
EE Times Twitter Feed

Datasheets.com Parts Search

185 million searchable parts
(please enter a part number or hit search to begin)
EE Life
Frankenstein's Fix, Teardowns, Sideshows, Design Contests, Reader Content & More
Max Maxfield

Are Today's Designs Bound by the Constraints of Yesteryear?
Max Maxfield
25 comments
As part of my ongoing Pedagogical and Phantasmagorical Inamorata Prognostication Engine project (try saying that 10 times quickly), I'm working with Jason Dueck from Instrument Meter ...

Jolt Judges and Andrew Binstock

Jolt Awards: The Best Books
Jolt Judges and Andrew Binstock
1 Comment
As we do every year, Dr. Dobb's recognizes the best books of the last 12 months via the Jolt Awards -- our cycle of product awards given out every two months in each of six categories. No ...

Engineering Investigations

Air Conditioner Falls From Window, Still Works
Engineering Investigations
2 comments
It's autumn in New England. The leaves are turning to red, orange, and gold, my roses are in their second bloom, and it's time to remove the air conditioner from the window. On September ...

David Blaza

The Other Tesla
David Blaza
5 comments
I find myself going to Kickstarter and Indiegogo on a regular basis these days because they have become real innovation marketplaces. As far as I'm concerned, this is where a lot of cool ...