Embedded Systems Conference
Breaking News
Comments
Newest First | Oldest First | Threaded View
old account Frank Eory
User Rank
Author
re: Image gallery: Recovering Renesas' Naka fab
old account Frank Eory   8/7/2011 5:56:30 PM
NO RATINGS
Truly impressive, even heroic, that they were able to accomplish this so quickly.

t.alex
User Rank
Author
re: Image gallery: Recovering Renesas' Naka fab
t.alex   8/4/2011 2:59:26 PM
NO RATINGS
Hopefully they can bring back the operation soon. Keep up the spirit!

junko.yoshida
User Rank
Author
re: Image gallery: Recovering Renesas' Naka fab
junko.yoshida   8/4/2011 2:49:19 PM
NO RATINGS
Looking at the last photo of this image gallery, some of you may have thought: "What’s up with a baseball cut out in the middle of this group picture?" The cut out, as it turns out, shows Yukiko Ueno, a softball pitcher for Japan’s national team. And she is also a Renesas employee at Naka fab. Ueno, a pride and joy of the fellow Naka fab employees, was the first pitcher ever to produce a perfect game at the Olympics against China in Athens. Ueno’s colleagues wanted her to be represented in the photo.

junko.yoshida
User Rank
Author
re: Image gallery: Recovering Renesas' Naka fab
junko.yoshida   8/3/2011 9:04:57 PM
NO RATINGS
As we reported, for a long time, we had never been able to see photos inside Naka fab after the quake. The image gallery posted here should give you a good sense of the extraordinary efforts it took to rebuild the fab. Don't forget to view the video clip, also rleased by Renesas, and hear their voices! http://www.eetimes.com/electronics-blogs/rambling--round/4218474/Post-quake---The-finest-hour--of-Renesas-and-the-industry

yalanand
User Rank
Author
re: Image gallery: Recovering Renesas' Naka fab
yalanand   8/3/2011 7:40:53 PM
NO RATINGS
This is great news indeed and the best part is they finished this three months earlier than anyone had expected. This goes to show the hard working nature of Japanese people.



Radio
LATEST ARCHIVED BROADCAST
As data rates begin to move beyond 25 Gbps channels, new problems arise. Getting to 50 Gbps channels might not be possible with the traditional NRZ (2-level) signaling. PAM4 lets data rates double with only a small increase in channel bandwidth by sending two bits per symbol. But, it brings new measurement and analysis problems. Signal integrity sage Ransom Stephens will explain how PAM4 differs from NRZ and what to expect in design, measurement, and signal analysis.

Datasheets.com Parts Search

185 million searchable parts
(please enter a part number or hit search to begin)
Like Us on Facebook
Special Video Section
The LTC®6363 is a low power, low noise, fully differential ...
Vincent Ching, applications engineer at Avago Technologies, ...
The LT®6375 is a unity-gain difference amplifier which ...
The LTC®4015 is a complete synchronous buck controller/ ...
10:35
The LTC®2983 measures a wide variety of temperature sensors ...
The LTC®3886 is a dual PolyPhase DC/DC synchronous ...
The LTC®2348-18 is an 18-bit, low noise 8-channel ...
The LT®3042 is a high performance low dropout linear ...
Chwan-Jye Foo (C.J Foo), product marketing manager for ...
The LT®3752/LT3752-1 are current mode PWM controllers ...
LED lighting is an important feature in today’s and future ...
Active balancing of series connected battery stacks exists ...
After a four-year absence, Infineon returns to Mobile World ...
A laptop’s 65-watt adapter can be made 6 times smaller and ...
An industry network should have device and data security at ...
The LTC2975 is a four-channel PMBus Power System Manager ...
In this video, a new high speed CMOS output comparator ...
The LT8640 is a 42V, 5A synchronous step-down regulator ...
The LTC2000 high-speed DAC has low noise and excellent ...
How do you protect the load and ensure output continues to ...