Breaking News
Comments
Newest First | Oldest First | Threaded View
Dave.Dykstra
User Rank
Rookie
re: AMD warns of lower Q3 sales
Dave.Dykstra   9/30/2011 3:54:08 AM
NO RATINGS
Well, the most interesting part of this is the unsaid part: AMD is apparently not blaming the economy as most others seem to be. Maybe there is hope after all.

larkforsure
User Rank
Rookie
re: AMD warns of lower Q3 sales
larkforsure   9/29/2011 7:05:30 PM
NO RATINGS
[ SOS ] Complaint with IBM China CSR on Centenial Please Google: Tragedy of Labor Rights Repression in IBM China

larkforsure
User Rank
Rookie
re: AMD warns of lower Q3 sales
larkforsure   9/29/2011 7:05:17 PM
NO RATINGS
[ SOS ] Complaint with IBM China CSR on Centennial [ Review ] How Much IBM Can Get Away with is the Responsibility of the Media http://wp.me/p1hDC3-aL IBM Advised to Treat its People with Humanism in China http://wp.me/p1hDC3-aW Tragedy of Labor Rights Repression in IBM China http://wp.me/p1hDC3-92 Scandal stricken IBM detained mother of ex-employee on the day of centennial http://wp.me/p1hDC3-8I

SiliconAsia
User Rank
Rookie
re: AMD warns of lower Q3 sales
SiliconAsia   9/29/2011 2:09:17 PM
NO RATINGS
Sounds like both yield and capacity issue to me. Where is all the CAPEX being spent at Global Foundries?

mcgrathdylan
User Rank
Blogger
re: AMD warns of lower Q3 sales
mcgrathdylan   9/29/2011 6:26:17 AM
NO RATINGS
Thanks for pointing out this error. It has been corrected. Our apologies.

resistion
User Rank
CEO
re: AMD warns of lower Q3 sales
resistion   9/29/2011 2:46:07 AM
NO RATINGS
They should get their 45 nm out first, then fix the 32 nm with dedicated time. Capex was supposed to take care of insufficient tools for ramps.

Robotics Developer
User Rank
Rookie
re: AMD warns of lower Q3 sales
Robotics Developer   9/28/2011 11:14:11 PM
NO RATINGS
It looks like a piece of the article was cut (or lost): "AMD said the shortfall was primarily due to 32-nm yield, ramp and manufacturing issues at Globalfoundries' fab in Dresden, Germany, which limited supply of the company's WHAT GOES HERE? The less-than-forecasted preliminary third quarter 2011 revenue results are" It is too bad that they are being limited by the foundry yields. I wonder if there was any other issues aside from yield like perhaps production capacity? Just wondering..



Flash Poll
Top Comments of the Week
Like Us on Facebook
EE Times on Twitter
EE Times Twitter Feed

Datasheets.com Parts Search

185 million searchable parts
(please enter a part number or hit search to begin)
EE Life
Frankenstein's Fix, Teardowns, Sideshows, Design Contests, Reader Content & More
Max Maxfield

Vetinari Clock: Decisions, Decisions, Decisions …
Max Maxfield
20 comments
Things are bouncing merrily along with regard to my uber-cool Vetinari Clock project. The wooden cabinet is being handcrafted by my chum Bob (a master carpenter) using an amazing ...

Jolt Judges and Andrew Binstock

Jolt Awards: The Best Books
Jolt Judges and Andrew Binstock
1 Comment
As we do every year, Dr. Dobb's recognizes the best books of the last 12 months via the Jolt Awards -- our cycle of product awards given out every two months in each of six categories. No ...

Engineering Investigations

Air Conditioner Falls From Window, Still Works
Engineering Investigations
2 comments
It's autumn in New England. The leaves are turning to red, orange, and gold, my roses are in their second bloom, and it's time to remove the air conditioner from the window. On September ...

David Blaza

The Other Tesla
David Blaza
5 comments
I find myself going to Kickstarter and Indiegogo on a regular basis these days because they have become real innovation marketplaces. As far as I'm concerned, this is where a lot of cool ...