Breaking News
Comments
Newest First | Oldest First | Threaded View
yalanand
User Rank
Author
re: Intel's Ivy Bridge delayed, says senior executive
yalanand   3/4/2012 11:50:27 AM
NO RATINGS
@Sylvie any particular reason for this delay ? Is it deliberate delay by Intel or is it really facing technical challenges at 22nm node?

TarraTarra!
User Rank
Author
re: Intel's Ivy Bridge delayed, says senior executive
TarraTarra!   2/27/2012 8:04:46 PM
NO RATINGS
Why is it surprising? The new finfet technology is such a radical departure from previous tick-tock shrinks that some hiccup is to be expected. The very original timelines had Ivy Bridge introductions in Q4 11/Q1 12 timeframe, so that would amount to a glitch. Even the mighty Intel is not immune to the challenges of very deep submicron manufacturing. Note this is not a few working die to characterize for publications - this is shipping in volume with the yields that the business is based on - a big difference.

chipmonk0
User Rank
Author
re: Intel's Ivy Bridge delayed, says senior executive
chipmonk0   2/27/2012 7:35:02 PM
NO RATINGS
who are these reporters ? what are their qualification and track record for responsible journalism ?

the_floating_ gate
User Rank
Author
re: Intel's Ivy Bridge delayed, says senior executive
the_floating_ gate   2/27/2012 4:29:23 PM
NO RATINGS
Jim McGregor of In-Stat told EE Times that according to his industry sources in Taiwan, Intel's Ivy Bridge server parts were only delayed from April 8 until April 29, though the dual core i5 and i7 parts for notebooks had been pushed out from a planned May 13th launch to June 3. Core i3 parts would launch as planned on June 24, said McGregor. That's three weeks - I am not sure a manufacturing glitch would fixable in 3 weeks considering cycletime is probably on the order of 10 to 12 weeks. Nobody knows - someone makes an assumption - this will be repeated and than it becomes "news" Why does not Sylvie digg up the interview or is there no written copy?

resistion
User Rank
Author
re: Intel's Ivy Bridge delayed, says senior executive
resistion   2/27/2012 3:22:38 AM
NO RATINGS
They're waiting for people to clear out their current Sandy Bridge overstock, but everyone is waiting for Ivy Bridge, it's a vicious circle.



Datasheets.com Parts Search

185 million searchable parts
(please enter a part number or hit search to begin)
Like Us on Facebook
Special Video Section
Protecting sensitive electronic circuitry from voltage ...
09:45
Watch as a web server authenticates or rejects a water ...
Protecting sensitive electronic circuitry from voltage ...
Watch as a web server authenticates or rejects a water ...
Protecting sensitive electronic circuitry from voltage ...
Power can be a gating factor in success or failure of ...
Get to market faster and connect your next product to the ...
00:44
See how microQSFP is setting a new standard for tomorrow’s ...
The LTC3649 step-down regulator combines key features of a ...
Once the base layer of a design has been taped out, making ...
In this short video we show an LED light demo to ...
The LTC2380-24 is a versatile 24-bit SAR ADC that combines ...
In this short video we show an LED light demo to ...
02:46
Wireless Power enables applications where it is difficult ...
07:41
LEDs are being used in current luxury model automotive ...
With design sizes expected to increase by 5X through 2020, ...
01:48
Linear Technology’s LT8330 and LT8331, two Low Quiescent ...
The quality and reliability of Mill-Max's two-piece ...
LED lighting is an important feature in today’s and future ...
05:27