Embedded Systems Conference
Breaking News
Comments
Newest First | Oldest First | Threaded View
Page 1 / 2   >   >>
Atomic9
User Rank
Author
re: HP cuts data center power in lab tests
Atomic9   9/11/2012 1:20:08 AM
NO RATINGS
Mmm I cant see the average 2.0 user tolerating ANY kind of speed or convenience hit in actuality ;) It sounds a worthy project - but maybe kinda fiddly to apply, for a real world data centre ? Mind you when i saw the headline 'HP cuts data center power in lab tests' I thought the management hadn't paid the electricity bill.. "C'mon you guys, turn it back on !"

I_B_GREEN
User Rank
Author
re: HP cuts data center power in lab tests
I_B_GREEN   6/9/2012 12:41:48 AM
NO RATINGS
pop up would give you option so best of both worldds can be optimized in terms of convenience and power savings. Sometimes I could wait other times I do not (think map/driving direction-navigation...)

I_B_GREEN
User Rank
Author
re: HP cuts data center power in lab tests
I_B_GREEN   6/9/2012 12:40:13 AM
NO RATINGS
if can't wait "get it now" you energy hog! If one is going to look at multiple topics/videos then the delay is not a big deal. Needs buffering-storage on end user to capture for when user ready to view. Static internet pay model needs tweaking to incentify the end user to take convience hit to save money along with providers to maximise energy savings possible

I_B_GREEN
User Rank
Author
re: HP cuts data center power in lab tests
I_B_GREEN   6/9/2012 12:36:35 AM
NO RATINGS
Hooks need to be at customer end to put tasks in bins, right away, can't wait, that utube video you want right now, or backup, intensive computation that takes hours can be scheduled at night just like backups when power is cheaper and can spread workload into non peak power times. I bet you could double it by offering power saving patches and configurers for existing pc's and laptops in the field. Another huge saving is to ask video and music streamers if they can wait a few until they can be added to stream list of end users so one stream can be farmed out to 10 to 10million at once. only the end nodes use the same amount of power. each branch up stream uses less and less power and resources freeing up server % headroom.

GPBobby
User Rank
Author
re: HP cuts data center power in lab tests
GPBobby   6/4/2012 9:05:39 PM
NO RATINGS
@goafrit: I think you have several separate concepts mixed up. First, there is very little obvious connection between a companies electrical efficiency (different than total consumption) and its number of employees; Second, I haven't read that any technical innovation is as responsible for the layoffs as is the general economy and lack of profitable sales. As a matter of fact, new technologies usually lead to new products which lead to new jobs. As you, I also feel sorry for those laid off. Perhaps the solution here is in the November ballot box.

docdivakar
User Rank
Author
re: HP cuts data center power in lab tests
docdivakar   5/31/2012 5:02:25 PM
NO RATINGS
@Rick: many details are missing and I suppose they weren't readily available. The energy efficiencies and the eventual proximity to a 'net-zero' status needs solutions at many levels -in the infrastructure that is intelligent, in the appliances (servers, switches, routers, storage) that implement energy efficient ethernet, airflow and cooling management, load balancing down to the rack level, etc. @selinz: I hear you! Google already implements many best practices for the march toward net-zero data center, take a look: http://www.google.com/about/datacenters/ http://www.google.com/about/datacenters/best-practices.html MP Divakar

selinz
User Rank
Author
re: HP cuts data center power in lab tests
selinz   5/31/2012 3:51:45 PM
NO RATINGS
So on the surface it sounds like they want their people working and doing their computing at a time when they can benefit from solar power. So people can work day shifts... Do I need linux software to tell me that? Sorry, couldn't resist.

rick merritt
User Rank
Author
re: HP cuts data center power in lab tests
rick merritt   5/31/2012 6:22:00 AM
NO RATINGS
HP gave the example of scheduled daily laptop backups as something that was not time critical and pretty common for many cloud service providers and corporations.

DrQuine
User Rank
Author
re: HP cuts data center power in lab tests
DrQuine   5/31/2012 1:17:42 AM
NO RATINGS
Running on local hydro, wind, and solar power can reduce the need for utility grid energy. Virtualization to minimize the use of unnecessary servers can reduce CPU energy consumption. These well known facts don't require new UNIX software on every server. Perhaps following current best software practices and developing local renewable energy sources (in a suitable location) to feed the grid (make money) would be the best way to reduce server farm energy costs.

markhahn0
User Rank
Author
re: HP cuts data center power in lab tests
markhahn0   5/30/2012 10:02:41 PM
NO RATINGS
I question the relevance of this kind of research. it seems to be based on the concept of a workload that can tolerate substantial delay in execution, and I simply can't think of why. this is not interesting for anything web-ish (where work is basically interactive and can't be put off.) it's not useful for HPC (where all machines are 100% busy anyway.) I suppose there are still some workloads where jobs simply need to run "sometime in the next day" - some kind of accounting stuff maybe, but isn't that sort of last-century?

Page 1 / 2   >   >>


Most Recent Comments
Susan Rambo
 
MFahmy0
 
cd2012
 
junko.yoshida
 
MikeD95101
 
betajet
 
junko.yoshida
 
Bill_Higdon
 
Tom_C
Radio
LATEST ARCHIVED BROADCAST
Overview: Battle-hardened veterans of the electronics industry have heard of the “connected car” so often that they assume it’s a done deal. But do we really know what it takes to get a car connected and what its future entails? Join EE Times editor Junko Yoshida as she moderates a panel of movers and shakers in the connected car business. Executives from Cisco, Siemens and NXP will share ideas, plans and hopes for connected cars and their future. After the first 30 minutes of the radio show, our listeners will have the opportunity to ask questions via live online chat.
Flash Poll
Like Us on Facebook

Datasheets.com Parts Search

185 million searchable parts
(please enter a part number or hit search to begin)
Special Video Section
LED lighting is an important feature in today’s and future ...
Active balancing of series connected battery stacks exists ...
After a four-year absence, Infineon returns to Mobile World ...
A laptop’s 65-watt adapter can be made 6 times smaller and ...
An industry network should have device and data security at ...
The LTC2975 is a four-channel PMBus Power System Manager ...
In this video, a new high speed CMOS output comparator ...
The LT8640 is a 42V, 5A synchronous step-down regulator ...
The LTC2000 high-speed DAC has low noise and excellent ...
How do you protect the load and ensure output continues to ...
General-purpose DACs have applications in instrumentation, ...
Linear Technology demonstrates its latest measurement ...
10:29
Demos from Maxim Integrated at Electronica 2014 show ...
Bosch CEO Stefan Finkbeiner shows off latest combo and ...
STMicroelectronics demoed this simple gesture control ...
Keysight shows you what signals lurk in real-time at 510MHz ...
TE Connectivity's clear-plastic, full-size model car shows ...
Why culture makes Linear Tech a winner.
Recently formed Architects of Modern Power consortium ...
Specially modified Corvette C7 Stingray responds to ex Indy ...