re: Planning to fail is planning to fail
LiketoBike   3/7/2013 6:35:59 PM
NO RATINGS
This has been my experience. Especially when doing something new, management is NEVER satisfied with a REALISTIC schedule. That's always too long. Well, one can squish the lines around on a Gantt chart all one wants, force-fitting a project into an arbitrary timespan...but things still take as long as they take. Working 20 hour days is NOT sustainable. Hire more people, accept less features, or spend more money (this sounds like, "Good, cheap, fast - pick two" :-) )

anon9303122
User Rank
Author
re: Planning to fail is planning to fail
anon9303122   2/7/2013 7:40:40 PM
NO RATINGS
Usually the problem is that when engineering provides the Basis of Estimates (BOE's), the reality of what it takes to successfully complete the jobs clashes with the program management's Price to Win (PTW). Guess which always wins ??? Then of course later, engineering gets a black eye for being behind schedule and over budget. There is so much fodder for Dilbert cartoons we can't even begin to list it.

philipoakley
User Rank
Author
re: Planning to fail is planning to fail
philipoakley   2/4/2013 9:59:48 PM
NO RATINGS
Making predictions is hard, especially about the future. Such is the problem of planning development (i.e. new designs). It is much easier to plan how long it will take to do 'the same thing' again. The hard bit is identifying which parts are 'the same thing' and which parts are 'new and unknown'. Even then, you still need to know how long it took / what it cost last time, which usually isn't available anyway as such data is fudged, hidden, held by others who aren't telling, etc. The end result is to make a guess, double it, and then double again, so the programme manager can halve it, which then allows for when your optimism (guess) meets reality!

dick_freebird
User Rank
Author
re: Planning to fail is planning to fail
dick_freebird   2/4/2013 6:14:46 PM
NO RATINGS
If you want to survive as a practicing engineer you had best get good at recovering gracefully because there will be first-pass failures, especially if you're the first to try (and where else would you want to be?). Planning-in the most sensible and cost effective mitigations (spares on chip, late-levels reworkability, backup lots and so on for the semiconductor types) will make some managers whine about cost (ditto telling them you need twice as much verification time and the tools to do it) but it's on you, so act accordingly. "No battle plan survives contact with the enemy" But you had better learn how to pack.

nosnhojn
User Rank
Author
re: Planning to fail is planning to fail
nosnhojn   2/4/2013 5:52:23 PM
NO RATINGS
WKetel, I agree with you. Our focus was strictly success wrt initial project plan (ie. planning/execution) to measure effectiveness of planning approaches. Obviously that's just 1 component of success that should include product quality, etc. -neil

nosnhojn
User Rank
Author
re: Planning to fail is planning to fail
nosnhojn   2/4/2013 5:41:02 PM
NO RATINGS
thanks sparky_watt. we contend hardware planning approaches are broken and I think your opinion that very few companies plan supports that idea. planning to fail, failing to plan, they both end up at the same place. thanks for reading! -neil

WKetel
User Rank
Author
re: Planning to fail is planning to fail
WKetel   2/3/2013 3:33:50 AM
NO RATINGS
One additional fact is that having a really good plan does not by any means assure that the project itself is a one that will succeed. I have seen very good plans that carried out very dumb ideas very well. So even if it is possible to cover all of the individual things that must be done for a project, none of that effort makes the original idea a good idea that will certainly succeed.

Sparky_Watt
User Rank
Author
re: Planning to fail is planning to fail
Sparky_Watt   2/2/2013 12:09:53 AM
NO RATINGS
This is fundamentally flawed. The flaw is that I have seen very few companies that PLAN a project. They put together "project plans" but they haven't planned the project. They just take a wing at what they think they can do and call that a plan. Often the plan includes make-or-break constraints that are put there by someone that has no clue (we have to have this in six months, or our effort is wasted, failure is not an option). Let's face it. Planning is hard work and largely unproductive. What it really does for us is set expectations and allows us to prepare. And it allows us to choose intelligently. But, it can't be done in a half hour by a group sitting around a table. You need to research the requirements, estimate the needs and the uncertainties. It can then be assembled by that group, but it almost always is unacceptably long and expensive, so it gets arbitrarily cut. Then it isn't a plan anymore, it is a wish.



Datasheets.com Parts Search

185 million searchable parts
(please enter a part number or hit search to begin)
Radio
LATEST ARCHIVED BROADCAST

What are the engineering and design challenges in creating successful IoT devices? These devices are usually small, resource-constrained electronics designed to sense, collect, send, and/or interpret data. Some of the devices need to be smart enough to act upon data in real time, 24/7. Specifically the guests will discuss sensors, security, and lessons from IoT deployments.

Brought to you by:

Most Recent Comments
Like Us on Facebook
Special Video Section
Once the base layer of a design has been taped out, making ...
In this short video we show an LED light demo to ...
The LTC2380-24 is a versatile 24-bit SAR ADC that combines ...
In this short video we show an LED light demo to ...
02:46
Wireless Power enables applications where it is difficult ...
07:41
LEDs are being used in current luxury model automotive ...
With design sizes expected to increase by 5X through 2020, ...
01:48
Linear Technology’s LT8330 and LT8331, two Low Quiescent ...
The quality and reliability of Mill-Max's two-piece ...
LED lighting is an important feature in today’s and future ...
05:27
The LT8602 has two high voltage buck regulators with an ...
05:18
Silego Technology’s highly versatile Mixed-signal GreenPAK ...
The quality and reliability of Mill-Max's two-piece ...
01:34
Why the multicopter? It has every thing in it. 58 of ...
Security is important in all parts of the IoT chain, ...
Infineon explains their philosophy and why the multicopter ...
The LTC4282 Hot SwapTM controller allows a board to be ...
This video highlights the Zynq® UltraScale+™ MPSoC, and sho...
Homeowners may soon be able to store the energy generated ...
The LTC®6363 is a low power, low noise, fully differential ...