Breaking News
Comments
Newest First | Oldest First | Threaded View
MagFlux
User Rank
Rookie
ISO Conformance no big deal
MagFlux   4/10/2014 7:27:02 PM
NO RATINGS
When time came for Calibration we had a test station sent to us from the NRC, (National Research Council) in Ottawa, Canada. This units calibration was tracable to the international standard wherever on earth that was. If anyone who was our client, ISO Auditor or similar wanted, he/she could question the reality distorted bureaucratic bubble that is Ottawa. Most clients and auditors choose to be happy with our record keeping rather than risk being lost in that alternate reality. Kidding aside, the calibration of some 200 DMMs, 50 Scopes and the various ATE's on the production floor only took a week of a technician's time( no enginneer required) on a part time basis as production coudln't be halted. The only problems we had were the engineers in the labs when we walked into their lair and said we were taking their test gear. Of course we were in riot gear and had pepper spray.

roshan shanbhag
User Rank
Rookie
ATE's need calibration
roshan shanbhag   10/17/2013 5:52:19 PM
With more and more complex parts coming out, Testers used to test these parts have to be calibrated periodically against a known standard and preventive mantenance must be done to ensure Quality. Calibration period may be once a month, once in 6 months or may be once a year or so depending upon the manufacturer's specifications. Usually the tester companies provide CAL boards and associated software to the customer ( companies ) to run CAL and checkers/diagnostics on the tester.

_hm
User Rank
CEO
Practical approach required
_hm   10/12/2013 8:07:05 PM
NO RATINGS
This may look endless and adds lots of unnecessary cost.

It does not have to be 100% bullet proof. One needs to consider product, its application and to what extent test is to be done and what can be tolerance for above described probable fauls.

Prevalent industry test procedure and calibration requirement suffice most applications. But yes, if you going to send your payload in space critical mission, go further and spend all money required.

 

MeasurementBlues
User Rank
Blogger
Testers need a little R&R
MeasurementBlues   10/12/2013 6:17:13 PM
NO RATINGS
Many engineers use check standards to verify equipment against a known quantity. Periodic calibration also helps.

For more, see my article Test your testers for R&R.

 



Flash Poll
EE Life
Frankenstein's Fix, Teardowns, Sideshows, Design Contests, Reader Content & More
Max Maxfield

MSGEQ7-Based DIY Audio Spectrum Analyzer: Testing
Max Maxfield
13 comments
In my previous column on this topic, we discussed the step-by-step construction of the first pass at a MSGEQ7-based DIY audio spectrum analyzer for use in my BADASS Display project. Of ...

Karen Field

June 2014 Cartoon Caption Winner
Karen Field
13 comments
Congratulations to "Wnderer" for submitting the winning caption for our June cartoon, after much heated conversation by our judges, given the plethora of great entries.

Jeremy Cook

Inspection Rejection: Why More Is Less in a Vision System
Jeremy Cook
3 comments
Albert Einstein has been quoted as saying, "Everything should be as simple as possible, but not simpler." I would never claim to have his level of insight -- or such an awesome head of ...

Jeremy Cook

Machine Fixes That Made Me Go 'DUH!'
Jeremy Cook
21 comments
As you can see in my bio at the end of this article, I work as a manufacturing engineer. One of my favorite things that happens on a Friday late in the afternoon is to hear my phone ring ...

Top Comments of the Week
Like Us on Facebook
EE Times on Twitter
EE Times Twitter Feed

Datasheets.com Parts Search

185 million searchable parts
(please enter a part number or hit search to begin)