Breaking News
Comments
Newest First | Oldest First | Threaded View
Page 1 / 6   >   >>
Max The Magnificent
User Rank
Blogger
Re: An additional test
Max The Magnificent   12/3/2013 3:59:44 PM
NO RATINGS
@Crusty: You probably have the measure of it.

12 inches, but I don't use it as a rule ... I'm sorry, what were we talking about? LOL

Crusty1
User Rank
CEO
Re: An additional test
Crusty1   12/3/2013 3:56:48 PM
NO RATINGS
@Max ; You probably have the measure of it.

Max The Magnificent
User Rank
Blogger
Re: An additional test
Max The Magnificent   12/3/2013 3:47:37 PM
NO RATINGS
@Crusty: Mrs Crusty does not allow me out that much...

She tells me that she has to take you everywhere twice ... the second time is to apologise for the first :-)

Crusty1
User Rank
CEO
Re: An additional test
Crusty1   12/3/2013 3:20:36 PM
NO RATINGS
@Max: With the thousands of miles of MICC I accepted for the fire alarms at London Underground post Kings Cross Fire, I almost became a world aclaimed connoisseur of MICC cable installation.

I can still walk around the sations and say which crew installed a particular section, just by looking at the way it is dressed into the building fabric. I think LU took the whole output for England for two years, some say the total length used would reach the moon.

If you are going to downgrade a cable then you have to be as good as the men installing, so I learnt to dress and terminate MICC. The Japanese joke that MICC is the English plumbing electricity, it has to be installed at site and can not be pre-constructed in a factory.

I have got data rates of over a Meg across a kilometer of MICC which considering it was not designed for such use is amazing.

But correct after working 7 nights a week for two years installing/accepting the LU fire alarm systems Mrs Crusty does not allow me out that much.

Max The Magnificent
User Rank
Blogger
Re: An additional test
Max The Magnificent   12/3/2013 2:57:46 PM
NO RATINGS
@Crusty: Terminating and dressing multicore mineral insulated copper clad cable is a strangly satisfying past time.

You don't get out much, do you? (LOL)

anon0050695
User Rank
Rookie
The finalists must make "solder chains"
anon0050695   12/2/2013 5:23:34 PM
NO RATINGS
To really find the best of the best, the finalists need to solder 0.7mm (or thinner) soldering wire to itself ie make a loop. Then add another and another to form a long chain. It can be done; I was an expert 35 years ago. Using a modern electronic temperature controlled solcering irons is cheating!

\BR Morten C

 

KB3001
User Rank
CEO
Re: An additional test
KB3001   11/29/2013 2:57:09 PM
NO RATINGS
Cutters?  REAL engineers use their TEETH! (just kidding) :^}

 

What has the world come to hey!? :-)


dgreigml1
User Rank
Rookie
Re: Getting nasty
dgreigml1   11/29/2013 1:25:07 PM
NO RATINGS
Just fired it off at the wire end and sploog ends into a mug of acetone.

Power electronics lab style - we went thru several CO2 extinguishers per week.

The Cooner was for for large air cored toroids - just don't forget the anti-poloidal turn!

Having over 24 TO247 mosfets blowing up behind your back was a wee bit of a regular nuisance, and that was regular. Not my design but an inherited inverter that was sacrosanct. I came up with an cheaper IGBT version, ~200kHz switching, ~100kHz PLL resonant ZVZC switching and then quitely walked away from that job. That was 18 years ago.

As to why Radiologists' wanted 150kV @ 80kW, no idea. A zoo VET might need such a thing, but for humans?

 

Crusty1
User Rank
CEO
Re: An additional test
Crusty1   11/29/2013 12:54:42 PM
NO RATINGS
@antedeluvian : Lets give the new kids on the block something to cut their teeth on and make it a decathlon?

antedeluvian
User Rank
Blogger
Re: An additional test
antedeluvian   11/29/2013 12:31:29 PM
NO RATINGS
Crusty

How about snapping insulation tape with your fingers?

I guess Max should be organizing a triatholon.

 

Page 1 / 6   >   >>


EE Life
Frankenstein's Fix, Teardowns, Sideshows, Design Contests, Reader Content & More
Max Maxfield

Dr. Duino Diagnostic Shield Deduces Dilemmas in Arduino Shield Stacks
Max Maxfield
6 comments
As you are probably aware, I'm spending a lot of my free time creating Arduino-based projects, such as my Inamorata Prognostication Engine, my BADASS Display, and my Vetinari Clock.

EDN Staff

11 Summer Vacation Spots for Engineers
EDN Staff
20 comments
This collection of places from technology history, museums, and modern marvels is a roadmap for an engineering adventure that will take you around the world. Here are just a few spots ...

Glen Chenier

Engineers Solve Analog/Digital Problem, Invent Creative Expletives
Glen Chenier
15 comments
- An analog engineer and a digital engineer join forces, use their respective skills, and pull a few bunnies out of a hat to troubleshoot a system with which they are completely ...

Larry Desjardin

Engineers Should Study Finance: 5 Reasons Why
Larry Desjardin
46 comments
I'm a big proponent of engineers learning financial basics. Why? Because engineers are making decisions all the time, in multiple ways. Having a good financial understanding guides these ...

Flash Poll
Top Comments of the Week
Like Us on Facebook
EE Times on Twitter
EE Times Twitter Feed

Datasheets.com Parts Search

185 million searchable parts
(please enter a part number or hit search to begin)