Design Con 2015
Breaking News
Comments
Newest First | Oldest First | Threaded View
Page 1 / 7   >   >>
Max The Magnificent
User Rank
Blogger
Re: In a pinch....
Max The Magnificent   5/8/2014 3:17:36 PM
NO RATINGS
@Sir Cut: When i'm in a pinch I've ordered the two port terminal blocks at $.10 a peice


This would be a great solution except that the pitch is 5mm -- we need a pitcgh of 0.1" = 2.54mm -- but I will look around the Tayda site to see what else rthey have to offer -- thanks for the suggestion

Sir Cut
User Rank
Rookie
In a pinch....
Sir Cut   5/8/2014 2:25:03 PM
NO RATINGS
When i'm in a pinch I've ordered the two port terminal blocks at $.10 a peice from Tayda Electronics. Just slide 5 together to make 10 port block. Product info can be found here

Max The Magnificent
User Rank
Blogger
Re: Cheap screw terminals
Max The Magnificent   1/24/2014 10:04:47 AM
NO RATINGS
@rzd: I think that a visit to the market should be a required part of the education for many engineers.

I hope someone reading thsi column and these comments says "We really need to pay for Max to visit the Hua qiang bei lu market so he can take pictures and write blogs about it" LOL

Max The Magnificent
User Rank
Blogger
Re: plan ahead
Max The Magnificent   1/24/2014 10:02:37 AM
NO RATINGS
@Ewertz: Don't buy/stuff connectors that you're unsure that you're going to use...

You make some very good points -- we will take these into consideration for the future if we go to a larger build -- but for the first 1-off I do want it to be fully populated so (a) I can see it in all its glory and (b) it's ready and waiting as I stuff more and more things into my Prognostication Engine

rzd
User Rank
Rookie
Re: Cheap screw terminals
rzd   1/23/2014 7:19:45 PM
NO RATINGS
"Slightly" off topic but one day in the Hua qiang bei lu market is not enough.  I think that a visit to the market should be a required part of the education for many engineers. I made sure some of the engineers in my team spent several days there in order to understand how the black cell phone market designs phones.  It was enlightening and it was worth the investment. When you go there plan on at least a week.  I don't understand why some geek travel company doesn't organize week long tours that cover China's different technical markets.  The savings you can get buying all the stuff there can pay for part of the trip.  A few days in Sheznen at the electronics market.  A day in Shanghai to visit the smaller electronics market there but there is a whole section that deals in chemical lab equipment, which you cannot find in the Shenzhen market.  I'm sure there is an area in China where they have a market that speciallizes just in heavy machinery like mini-lathes/mills and their full size cousins. 

ewertz
User Rank
Manager
plan ahead
ewertz   1/23/2014 4:26:36 PM
NO RATINGS
1.  Don't buy/stuff connectors that you're unsure that you're going to use.  If vanity requires that the board look pretty (fully-stuffed) from day one, you get to pay for it.  Otherwise, as usual, designing/building for the worst case will simply cost you.

2.  Design the board for the least per-port cost of the connectors.  This might mean laying it out to accept only 4-port connectors at ~$0.35/port rather than for some of the outliers at ~$0.60/port.  Because the blocks often don't snug-up to each other while maintaining their 2.54mm centers on the grid from block to block, you have to do this up front (unless you want to *try* to shave the blocks down).  You may also benefit by standardizing on smaller connectors by moving up the quantity discount scale.  See again #1.

3.  Buying no-name parts retail from China can be a fine option for one-offs, but you can't always count on getting the same parts during subsequent buys.  The usual time/cost trade-off always exists here for shipping.

4.  Basically, plan ahead.  One nugget of common wisdom is that you don't design a project without choosing an enclosure ahead of time.  Although with 3D printers (or milling equipment), you can thoeretically make an enclosure after the fact (likely at a higher cost).  In general, the design isn't done until you've gone through and settled on your entire BOM and checked the parts for availability -- otherwise you "get" to buy your way out of the hole you've dug.

 

Max The Magnificent
User Rank
Blogger
Re: Tasty terminal blocks
Max The Magnificent   1/23/2014 4:01:31 PM
NO RATINGS
@SS_EE: I would buy 10 positions and saw off positions to make the shorter ones.

It sounds so easy if you say it quickly LOL

Max The Magnificent
User Rank
Blogger
Re: Cheap screw terminals
Max The Magnificent   1/23/2014 4:00:47 PM
NO RATINGS
@rzd: If you know anyone that is visiting Shenzhen [...] the electronics market in Hua qiang bei lu..

I would LOVE to spend a day wandering aroudn that electronics market -- all I need is some one to pay for me to go LOL

David Ashton
User Rank
Blogger
Re: Tasty terminal blocks
David Ashton   1/23/2014 3:57:17 PM
NO RATINGS
@SS_EE you'd need a pretty fine saw on the 0.1" spacing types I think :-)

A supplier of mine recently did a bulk special on 2- and 3-way TBs - worked out at about 10 or 15 c each I think, I got 25 of each.  Only 0.2" ones though.

SS_EE
User Rank
Rookie
Re: Tasty terminal blocks
SS_EE   1/23/2014 11:34:56 AM
NO RATINGS
I would buy 10 positions and saw off positions to make the shorter ones.

Page 1 / 7   >   >>


Flash Poll
Top Comments of the Week
Like Us on Facebook
EE Times on Twitter
EE Times Twitter Feed

Datasheets.com Parts Search

185 million searchable parts
(please enter a part number or hit search to begin)
EE Life
Frankenstein's Fix, Teardowns, Sideshows, Design Contests, Reader Content & More
Max Maxfield

Analog Faceplate Design Decisions: Art or Science?
Max Maxfield
32 comments
My degree is in Control Engineering -- a core of math with "surrounding subjects" of electronics, mechanics, and hydraulics and fluidics. The only official programming I did as part of ...

Jolt Judges and Andrew Binstock

Jolt Awards: The Best Books
Jolt Judges and Andrew Binstock
1 Comment
As we do every year, Dr. Dobb's recognizes the best books of the last 12 months via the Jolt Awards -- our cycle of product awards given out every two months in each of six categories. No ...

Engineering Investigations

Air Conditioner Falls From Window, Still Works
Engineering Investigations
3 comments
It's autumn in New England. The leaves are turning to red, orange, and gold, my roses are in their second bloom, and it's time to remove the air conditioner from the window. On September ...

David Blaza

The Other Tesla
David Blaza
5 comments
I find myself going to Kickstarter and Indiegogo on a regular basis these days because they have become real innovation marketplaces. As far as I'm concerned, this is where a lot of cool ...