resistion
User Rank
CEO
TSV cost reduction
resistion   3/11/2014 9:29:21 PM
NO RATINGS
What is the plan for TSV cost reduction? Is it the TSV fabrication that is the key cost or TSV-related integration into the product (like testing)?

alex_m1
User Rank
CEO
Re: how does this relate to servers?
alex_m1   3/11/2014 6:13:18 PM
NO RATINGS
Since each hmc has 8 layers of dram, my guess is that for first version they prefer to use old manufacturing lines and get some money from them, instead of taking a risk a reusing new manufacturing lines.

 

TanjB
User Rank
Rookie
how does this relate to servers?
TanjB   3/11/2014 3:54:36 PM
NO RATINGS
The size of the modules (2GB) makes this look like a technology for local GPU memory or perhaps even for mobile devices.  But servers?  How does this add up to 128GB or more seen on modern servers?  Is there something else in plan for that market, or does that remain DDR4 territory?

TanjB
User Rank
Rookie
Re: DDR4 replacement??
TanjB   3/11/2014 3:52:06 PM
NO RATINGS
Power costs at 10 cents/kWh are about 80 cents per year per watt.  Many data centers have lower contracts than that, but should add in overheads to build the power distribution and substation so it is on balance a fair estimate.  A 200W server (which includes the overhead ratio for a modern DC) is costing about $160 per year for power.  This puts the cost of power under 10% of operating costs.

The bigger cost is opportunity cost.  A DC is generally built out to the max power the site can obtain, so every watt in that 200W must be optimized.  If you add 1W in DRAM then you subtract 1W from something else.  Each W thus has an opportunity cost of about 0.5% of the server which more like $10 per year.

So, you have the right conclusion, but it can be helpful to have a better model of why.

Components which save power in the server market are definitely valuable.  Each W saved is worth dollars, so long as performance is not compromised.

alex_m1
User Rank
CEO
Re: DDR4 replacement??
alex_m1   3/11/2014 1:47:37 PM
NO RATINGS
Let's look at rought cost estimates of cloud computing:


Power related costs are nearly 40% of total, with saving in memory power could reduce 15% of those 40%, meaning 6% of total.

Since server costs are 50% of total ,those saving comes down to 3% of server cost.

Dell charges for a "performance" server $4100K :

"Dual Intel® Xeon® E5-2620 processors, 16GB memory, 500GB hard drive and 3 year ProSupport warranty"

http://www.dell.com/us/business/p/poweredge-r720/fs

 

3% * 4100 = $123 = $7.6 per GB of power savings (without speaking about other benefits). Considering the fact that DDR(consumer- serever costs more) costs $11.5 per GB , those power savings look like a good reason for adding an HMC to a cloud server even as main memory. 

TarraTarra!
User Rank
CEO
DDR4 replacement??
TarraTarra!   3/11/2014 1:02:52 PM
NO RATINGS
HMC, HBM and other technologies are certainly very interesting but I dont see how they would replace commodity DDR4 DRAM anytime soon. Am I missing something here?

 

The cost/bit of DDR3/DDR4 will continue to be much lower than what HMC/HBM will offer for a long time. HMC and HBM do offer interesting possibiities with on-die memory stacking, fast look-aide memory but will they replace DDR4 a the main memory for processors?

 

 

<<   <   Page 2 / 2


EE Life
Frankenstein's Fix, Teardowns, Sideshows, Design Contests, Reader Content & More
Max Maxfield

Synthesize Your Own RTOS for FREE!
Max Maxfield
6 comments
My chum Bob Zeidman, president of Zeidman Technologies, is always involved in something interesting. Some time ago, for example, he told me about SynthOS. This little scamp can ...

EDN Staff

11 Summer Vacation Spots for Engineers
EDN Staff
11 comments
This collection of places from technology history, museums, and modern marvels is a roadmap for an engineering adventure that will take you around the world. Here are just a few spots ...

Glen Chenier

Engineers Solve Analog/Digital Problem, Invent Creative Expletives
Glen Chenier
11 comments
- An analog engineer and a digital engineer join forces, use their respective skills, and pull a few bunnies out of a hat to troubleshoot a system with which they are completely ...

Larry Desjardin

Engineers Should Study Finance: 5 Reasons Why
Larry Desjardin
45 comments
I'm a big proponent of engineers learning financial basics. Why? Because engineers are making decisions all the time, in multiple ways. Having a good financial understanding guides these ...

Flash Poll
Top Comments of the Week
Like Us on Facebook
EE Times on Twitter
EE Times Twitter Feed

Datasheets.com Parts Search

185 million searchable parts
(please enter a part number or hit search to begin)