Embedded Systems Conference
Breaking News
Comments
Newest First | Oldest First | Threaded View
<<   <   Page 11 / 17   >   >>
csquared0
User Rank
Author
July Cartoon Caption
csquared0   7/4/2014 4:00:31 PM
I was promised a cubicle with an outside view!

briand66
User Rank
Author
Negative Carbon Footprint
briand66   7/4/2014 9:14:48 AM
NO RATINGS
I'm working my way towards Negative Carbon footprint. Does this qualify??

TFCSD
User Rank
Author
July Cartoon Caption Contest: Let's Talk Some Trash
TFCSD   7/4/2014 3:47:26 AM
NO RATINGS
Welcome to our new hardware development center, care for a tour?

TFCSD
User Rank
Author
July Cartoon Caption Contest: Let's Talk Some Trash
TFCSD   7/4/2014 3:39:36 AM
You software guys just don't get it

TFCSD
User Rank
Author
July Cartoon Caption Contest: Let's Talk Some Trash
TFCSD   7/4/2014 3:34:10 AM
NO RATINGS
This company's  equipment and labs are not so bad, the last place I worked was far worse

TFCSD
User Rank
Author
July Cartoon Caption Contest: Let's Talk Some Trash
TFCSD   7/4/2014 3:27:23 AM
NO RATINGS
This new portable hardware design lab is great

TFCSD
User Rank
Author
July Cartoon Caption Contest: Let's Talk Some Trash
TFCSD   7/4/2014 3:11:33 AM
NO RATINGS
Now that I have moved up into my own office, I can spread out my embedded prototypes without begging for space and enjoy the view

TFCSD
User Rank
Author
July Cartoon Caption Contest: Let's Talk Some Trash
TFCSD   7/4/2014 3:05:21 AM
NO RATINGS
Hey look! I found a way to bypass procurement and upgrade our equipment!

TFCSD
User Rank
Author
July Cartoon Caption Contest: Let's Talk Some Trash
TFCSD   7/4/2014 2:59:32 AM
NO RATINGS
Finally I can setup my all my equipment and get to work without management complaining about the mess

zeeglen
User Rank
Author
July Cartoon Caption
zeeglen   7/4/2014 12:29:10 AM
NO RATINGS
"Well, looks like old Bob is off to a hamfest/swapmeet again.  Always wondered where he finds all those goodies..."

<<   <   Page 11 / 17   >   >>


Radio
LATEST ARCHIVED BROADCAST
As data rates begin to move beyond 25 Gbps channels, new problems arise. Getting to 50 Gbps channels might not be possible with the traditional NRZ (2-level) signaling. PAM4 lets data rates double with only a small increase in channel bandwidth by sending two bits per symbol. But, it brings new measurement and analysis problems. Signal integrity sage Ransom Stephens will explain how PAM4 differs from NRZ and what to expect in design, measurement, and signal analysis.

Datasheets.com Parts Search

185 million searchable parts
(please enter a part number or hit search to begin)
Most Recent Comments
Like Us on Facebook
Special Video Section
The LTC®6363 is a low power, low noise, fully differential ...
Vincent Ching, applications engineer at Avago Technologies, ...
The LT®6375 is a unity-gain difference amplifier which ...
The LTC®4015 is a complete synchronous buck controller/ ...
10:35
The LTC®2983 measures a wide variety of temperature sensors ...
The LTC®3886 is a dual PolyPhase DC/DC synchronous ...
The LTC®2348-18 is an 18-bit, low noise 8-channel ...
The LT®3042 is a high performance low dropout linear ...
Chwan-Jye Foo (C.J Foo), product marketing manager for ...
The LT®3752/LT3752-1 are current mode PWM controllers ...
LED lighting is an important feature in today’s and future ...
Active balancing of series connected battery stacks exists ...
After a four-year absence, Infineon returns to Mobile World ...
A laptop’s 65-watt adapter can be made 6 times smaller and ...
An industry network should have device and data security at ...
The LTC2975 is a four-channel PMBus Power System Manager ...
In this video, a new high speed CMOS output comparator ...
The LT8640 is a 42V, 5A synchronous step-down regulator ...
The LTC2000 high-speed DAC has low noise and excellent ...
How do you protect the load and ensure output continues to ...