Design Con 2015
Breaking News
Comments
Newest First | Oldest First | Threaded View
<<   <   Page 2 / 3   >   >>
Wnderer
User Rank
CEO
Re: VanGogh Mosaic
Wnderer   7/28/2014 12:34:59 PM
NO RATINGS
I guess firing up the kiln is more of winter project than a summer project.

mhrackin
User Rank
CEO
Re: To all:
mhrackin   7/28/2014 10:37:49 AM
NO RATINGS
A good friend of mine decided several years ago that what he needed was a stand-alone workshop/shed.  His house is on a couple of acres, and he started to doodle some designs and layouts for all his machinery (he has a pretty full collection of metal-working stuff).  What the final design turned out to be is a 2000 SF shop masquerading as a garage (for permit purposes) with a garage door on one end and a wide conventional entry door on the side.  BTW, he HAS a basement, but it's mostly finished out (he has a fairly large family).  He did most of the work himself with some help from extended family, but had a "pro" do the slab foundation.  Now THAT is dedication!

Max The Magnificent
User Rank
Blogger
Re: To all:
Max The Magnificent   7/28/2014 10:28:17 AM
NO RATINGS
@mhrackin: Ever since I first became a homeowner, having a large basement has always been a priority for me...

I woudl love a large basement -- but they are rare in Huntsville Alabama. I do keep on toying with the idea of building a large workshop ... all I need is money LOL

Max The Magnificent
User Rank
Blogger
Re: To all:
Max The Magnificent   7/28/2014 10:26:26 AM
NO RATINGS
@mhrackin: You all seem destined to end up as I have, with a basement full of projects in stages ranging from completed but abandoned by technological obsolescence to still in the conceptual phase...

Actually, most of my projects are progressing rather well, although they do tend to move in "fits and starts" -- I think you will be surprised by the progress I have to show in the next couple of months...

Max The Magnificent
User Rank
Blogger
Re: VanGogh Mosaic
Max The Magnificent   7/28/2014 10:24:06 AM
NO RATINGS
@Wnderer: Speaking of projects, what happened to the Van Gogh Mosiac with home made ceramic bits?

Arrgghh -- that's the one project people always ask me about. The frame/base is sitting on the wooden chest outside my office -- I have a bunch of new glazes I want to experiment with -- I really need to fire up the kiln and get back to working on that ... but my weekends are now fully booked until the end of August (I only hope I won the lottery this past weekend -- I forgot to check the tickets -- if I did, I'll be able to devote a lot more time to my projects LOL)

Garcia-Lasheras
User Rank
Blogger
Re: At least you make progress...
Garcia-Lasheras   7/25/2014 7:57:13 AM
NO RATINGS
@Antedeluvian: "My wife insists that I get my Vitamin D quotient"

Well, I'm happy to see that I'm not the only one who gets into this conflict when summer arrives ;-)

I received a brand-new RaspberryPi B+ last week and I've only been able to unbox it and take a look to the PCB design... I hope I'll be able to catch-up with my hobbyist project in September!

mhrackin
User Rank
CEO
Re: To all:
mhrackin   7/24/2014 11:34:02 AM
NO RATINGS
My collection has traveled with me from NJ (where I grew up) to Boston, Chicago, Ft. Lauderdale, Atlanta, Dallas, then back to Atlanta.  Very little "triage" in all that over 54 years!  Ever since I first became a homeowner, having a large basement has always been a priority for me (except in S. Florida and Texas, where they are non-existent or very rare).

elizabethsimon
User Rank
CEO
Re: To all:
elizabethsimon   7/24/2014 11:27:25 AM
NO RATINGS
Yes, I do seem to be headed in that direction along with significant spill over of parts into the garage. Since I've moved a few times, I don't have anything much earlier than about 2000 or so. I have actually finished a few along the way. The problem is that I can come up with projects far faster than I can do them...

 

mhrackin
User Rank
CEO
To all:
mhrackin   7/24/2014 11:10:00 AM
NO RATINGS
You all seem destined to end up as I have, with a basement full of projects in stages ranging from completed but abandoned by technological obsolescence to still in the conceptual phase (usually including partial schematics, data sheets, and parts all sitting in a shoebox).  Some of mine go back to 1960 or so!  I did usually manage to complete my projects in the 1950s....  My big advantage is that as I do not undertake any projects that would entail resuscitating my ancient SW skills, most of the projects you are entangled with would never appear on my list!

Wnderer
User Rank
CEO
VanGogh Mosaic
Wnderer   7/24/2014 9:05:16 AM
NO RATINGS
Speaking of projects, what happened to the Van Gogh Mosiac with home made ceramic bits?

<<   <   Page 2 / 3   >   >>


Top Comments of the Week
Flash Poll
Like Us on Facebook

Datasheets.com Parts Search

185 million searchable parts
(please enter a part number or hit search to begin)
EE Life
Frankenstein's Fix, Teardowns, Sideshows, Design Contests, Reader Content & More
Max Maxfield

Want a Voltera Desktop PCB Printer?
Max Maxfield
11 comments
I just received an email from my chum Javi in Spain. "Have you heard about Voltera (VolteraInc.com)? It's a Canadian company that is going to offer desktop-size PCB printers for fast ...

Aubrey Kagan

Have You Ever Been Blindsided by Your Own Design?
Aubrey Kagan
37 comments
I recently read GCHQ: The uncensored story of Britain's most sensitive intelligence agency by Richard J. Aldrich. The Government Communication Headquarters (GCHQ), Britain's equivalent of ...

Martin Rowe

No 2014 Punkin Chunkin, What Will You Do?
Martin Rowe
2 comments
American Thanksgiving is next week, and while some people watch (American) football all day, the real competition on TV has become Punkin Chunkin. But there will be no Punkin Chunkin on TV ...

Rich Quinnell

Making the Grade in Industrial Design
Rich Quinnell
15 comments
As every developer knows, there are the paper specifications for a product design, and then there are the real requirements. The paper specs are dry, bland, and rigidly numeric, making ...

Special Video Section
The LT8640 is a 42V, 5A synchronous step-down regulator ...
The LTC2000 high-speed DAC has low noise and excellent ...
How do you protect the load and ensure output continues to ...
General-purpose DACs have applications in instrumentation, ...
Linear Technology demonstrates its latest measurement ...
10:29
Demos from Maxim Integrated at Electronica 2014 show ...
Bosch CEO Stefan Finkbeiner shows off latest combo and ...
STMicroelectronics demoed this simple gesture control ...
Keysight shows you what signals lurk in real-time at 510MHz ...
TE Connectivity's clear-plastic, full-size model car shows ...
Why culture makes Linear Tech a winner.
Recently formed Architects of Modern Power consortium ...
Specially modified Corvette C7 Stingray responds to ex Indy ...
Avago’s ACPL-K30T is the first solid-state driver qualified ...
NXP launches its line of multi-gate, multifunction, ...
Doug Bailey, VP of marketing at Power Integrations, gives a ...
See how to ease software bring-up with DesignWare IP ...
DesignWare IP Prototyping Kits enable fast software ...
This video explores the LT3086, a new member of our LDO+ ...
In today’s modern electronic systems, the need for power ...