REGISTER | LOGIN
Breaking News
Comments
Newest First | Oldest First | Threaded View
any1
User Rank
Author
re: Updated: 450-mm fab schedule slips
any1   1/26/2011 1:55:17 PM
NO RATINGS
The transition to 450 mm has been a tough sell for sure, but I can foresee a time where once a couple of early adopters such as Intel and Samsung make the move to 450 mm other companies will be forced to follow or they will no longer be competitive - especially the commodity memory producers. At that point we may see more consolidation and joint ventures as smaller players struggle to survive.

krisi
User Rank
Author
re: Updated: 450-mm fab schedule slips
krisi   1/25/2011 11:40:28 PM
NO RATINGS
I agree with Dave and @docdivakar and think this transition will continue to get pushed out...who can really afford it? Its a huge investment requiring new tools and new fabs. Intel and Samsung for sure but I doubt there will be many more takers...there is much more excitement in semi industry in growing vertically (3-D) than horizontally! I bet in the future there will be more silicon cubes than large silicon pizzas! Kris

Dave.Dykstra
User Rank
Author
re: Updated: 450-mm fab schedule slips
Dave.Dykstra   1/25/2011 9:57:12 PM
NO RATINGS
This is not too surprising given the state of the world's economies during the past couple of years. If you've not yet been able to get adequate returns on the current state of the art, you really aren't very willing to move on to the next, especially if you're still able to make money at the current level. I suspect we'll see a few large players making the move because they have seen the returns and can afford the investment and some slightly smaller players holding back and hoping to leap-frog to the next level when it becomes available.

docdivakar
User Rank
Author
re: Updated: 450-mm fab schedule slips
docdivakar   1/25/2011 8:18:43 PM
NO RATINGS
The analyst from Piper Jaffray makes a valid point: until the equipment makers (I would include backend and test equipment as well) see value-adding opportunity, the 450mm launch will keep getting pushed out. Chances are, by 2015 and beyond, there will be fewer fabs that can afford the $Billions needed to upgrade. This is definitely a quandary for the 300mm fabs; on one hand, we see fewer fabless companies with products off the drawing board (we hear any where from $5M to $50M for a new ASIC development), more consolidation that seems to be coming in fabless companies, while on the other, emerging 3D chips may still use 200mm wafers, or worse, put more pricing pressure on the 300mm fabs. MP Divakar



Like Us on Facebook
EE Life
Frankenstein's Fix, Teardowns, Sideshows, Design Contests, Reader Content & More
Martin Rowe

Test Tool Finds Ethernet Wiring Errors
Martin Rowe
Post a comment
When my house was renovated several years ago, I had the electrician install network outlets in numerous places, then run the LAN cables to a wiring closet. But he didn't document the ends ...

Martin Rowe

Local Electronics Store Supplies Engineers and Hobbyists
Martin Rowe
5 comments
Rochester, N.Y. — Tucked away in this western New York city known for its optics is Goldcrest Electronics, a local store that's supplied businesses and individuals with electronic ...

Martin Rowe

How to Transform a Technology University (Book Review)
Martin Rowe
1 Comment
The Presiding Genius of the Place by Alison Chisolm. WPI, Worcester, Mass., 234 pp., 2016. Engineers love to discuss, and often criticize, engineering education. They often claim ...

Max Maxfield

Aloha from EEWeb
Max Maxfield
Post a comment
Just a few minutes ago as I pen these words, I posted this blog about this month's Cartoon Punchline Competition over on EEWeb.com.